Worked on and completed:
- The steps from the Main Lodge to the Outdoor Amphitheater were worked on. 1 group of 4 will be needed to complete these steps next Saturday.
- Drilling and rebar was worked on on the girls side, additional steps will need to be completed on both the girls and boys side.
- Pathway and stairs to the Cooks Cabin were completed.
- Painters were finishing some of the trim painting on the doors. Electrical panel was worked on in the kitchen.
- Clean up of construction debris was accomplished around the saunas and bathhouses, cleaned up the equipment room for the water filtration system and prepared for additional expansion as well.
- Benches from the Upper Ramada were brought down to the seating area between the Main Lodge and the Staff Cabin.
- Work continued on the girls side drain field with finishing some of the drain areas and digging for adding two additional drain lines.