Most of the group
The painters
Daryl J and helper cleaned the kitchen in preparation for drywall
A retaining wall was built on the southwest corner of the lodge. Above the wall will be a picnic area.
Plans begin for the retaining wall/picnic area
Large boulders are lifted using the backhoe
Steve W placing a boulder
Maggie G cleaning the wall
As the wall is nearly finished, workers begin to level out the picnic area
Finished wall, picnic area is ready for perfecting
Another group worked on a stairway from the main road to the staff cabin. This work involved clearing a tree and small brush out of the way, laying gravel and finally steps.
Ben G clearing a path
The finished product
A painting crew caulked the lodge, staff cabin and both bathhouses in prep for painting. The paint color was chosen and painting will start soon.
Painters caulking lodge
Lars R caulking staff cabin
Clearing brush and debris is an ongoing project. This group spent the whole day hauling trailer loads away.
Heikki P kept the wheelbarrow rolling up and down the steep hillside
Many boys helped with the hauling
Nick G and Zack J take a water break
Scott W backfills the septic line
John L leveling the septic drain field
Many kids joined us at Kamp and were a good help. It is good for them to see how much work is going into their Kamp.
A group of kids enjoy breaktime
Girls enjoying the beautiful weather
Enjoying well deserved breaks. Morning coffee, lunch and afternoon coffee are served along with homemade baked goods.
The following pictures show previous completions
An outside view of the boy's bathhouse
Inside the girl's bathhouse, toilet area
Inside the girl's bathhouse, shower area
Inside the girl's bathhouse, view from the door of the sinks
Lodge ceiling finished
Steps leading to boys cabin