We had a very good turnout this Saturday, about 60 people including cooks and kitchen help. Thank you to all who continue to give your time and effort to build a camp.

Worked on and completed this week:

Completed backfill of girl's side drain field

Completed rough grade for the camp storage units

Removed three large trees that needed to be dropped for safety purposes

Cut area from hillside south of the girl's side drainfield to prepare a pad for a basketball court

Girl's sauna and bathhouse roof was worked on

Several crews hauled brush from the cabin areas to burn

Up to 20 guys gathered and placed rock on the hillside west of the lodge

Two chain saw crews cut down logs and brush throughout the camp to movable lengths for burning and removal

Completed interior sheeting and paint in the water treatment room, it is ready for equipment to be installed

The drain lines were finished and tied into the collection box and were backfilled

Installed two septic tanks by the girl's bathroom, they need to be adjusted for height, leveled and backfilled

Five electricians worked throughout the camp. We were able to get a majority of the electrical completed:
Exterior lights on lodge and bathhouse
Kitchen is almost complete
Finished wiring for refrigerator and freezer, both are working as expected

Continued work on the west side retaining wall and extended patio. 8-12 guys worked on this throughout the day making it 80% complete

Electricians



Electricians in kitchen



Rory S installing exterior light on lodge



Man and machine working together



Work on the west side



More work on west side, along path leading to future amphitheater



West side of lodge



Very big holding tanks



Stihls at a stand-still



Felling trees



Clearing



Burning



Girl's side drain field



More on girl's side



Working on bathhouse roof



On bathhouse roof



Spraying polyurea coating in bathhouse



Doesn't this look nice?