These can light trims were painted last week to match the ceiling
This Saturday we only had 15 workers present, but still accomplished much!
Boys side drain field was completed, inspected and backfilled. Final grading was also completed on the boys drain field and is ready for planting native ground cover.
Workers spread sand to protect the pipes from rocks
George N begins to level the drain field
Drain field at the end of the day
Girls side drain field pads and pipes were installed and worked on and will need to be completed.
Heikki P begins to level the drain field
Drain field at the end of the day
Continued to work on the pathways.
Jon S and boys clear a path
Near completion
Another path by the girl's cabins
Cabin completely cleared out (work from previous weeks)
All interiors of sleeping cabins were sealed.
Todd R preps his sprayer
Cabin interior before sealant
Cabin interior after sealant
Grading for the retaining rock wall was started on the east side of the Main Lodge.
John and Eric L removing boulders
Material for the retaining wall
FRP board was installed in the kitchen during the week.
The banker requested to come up to see how the project was going; she was very excited and impressed and had nothing but compliments to say about the camp.
And then, of course, we had a little lunch:
Dave and Jean K at the grill
Dave K and Mike J serve the guys
Workers enjoy lunch in the new picnic area behind the lodge
We have a need for many workers for each weekend for the rest of the summer; we need to work on the following:
Build rock retaining wall on the East side of the Main Lodge.
Continue building the pull out on the road from the Caretakers Cabin to the Main Lodge and move the material for fill to the west side of the lodge.
Need carpenters next weekend to expand the equipment room for the water filtration system.
Need electricians for wiring the boys and the girls saunas.
Continue working on the pathways and spreading gravel on all the pathways.
Continue drilling and installing rebar on the steps (approx 50% complete).
Spread and pack gravel on the maintenance walkway that was graded out last weekend.
Continue general cleanup of the construction materials.
The steps from the main lodge to the outdoor amphitheater needs to be completed.
The sauna framing and sheeting on the girls side needs to be finished.
Boys and girls saunas need wiring and exterior siding installed as well as the sheet metal roof.
The youth have volunteered to build the outdoor amphitheater using logs and material from the property. Steve Wuollet will coordinate this project.