Again this weekend we had 22 people including cooks. A few tasks were filled but many more remain. Thank you to all who have been able to help at Kamp.
Worked on and completed:
- The steps from the Outdoor Amphitheater to the Main Lodge started.
(50% complete)
Drilling and rebar was completed on the girls side, additional steps will need to be completed on both the girls and boys side.
Burned one pile of brush on the boys side.
Work continued on the girls side drain field with finishing sand base, pipes and pads. The girls side drain field needs to be backfilled, unable to backfill due to a flat tire on the tractor.
Started the keystone block retaining wall on the East side of the Main Lodge. (80% complete)
Boys and girls sauna roofs were dried in.
Demolition was completed of the old building that the water filtration equipment will be placed in. To be completed: There are 4 summer working weekends left. We have a need for many workers for each weekend for the rest of the summer.
See "To Do List" at right
There are hundreds and hundreds of estimated man hours remaining to complete our summer goals. We would like to remind everyone to help by coming up to Kamp Kipa so we can be ready to hold our first camp this fall.
July 23 2011
We had a smaller turnout this week again. 22 people including cooks and kitchen help
Worked on and completed:
Worked on and completed:
- The steps from the Main Lodge to the Outdoor Amphitheater were worked on. 1 group of 4 will be needed to complete these steps next Saturday.
- Drilling and rebar was worked on on the girls side, additional steps will need to be completed on both the girls and boys side.
- Pathway and stairs to the Cooks Cabin were completed.
- Painters were finishing some of the trim painting on the doors. Electrical panel was worked on in the kitchen.
- Clean up of construction debris was accomplished around the saunas and bathhouses, cleaned up the equipment room for the water filtration system and prepared for additional expansion as well.
- Benches from the Upper Ramada were brought down to the seating area between the Main Lodge and the Staff Cabin.
- Work continued on the girls side drain field with finishing some of the drain areas and digging for adding two additional drain lines.