Thursday, August 5, 2010
Last Week of July
The lodge from above
Cabins and lodge
Inside the lodge, view from the kitchen
Visitors
Framing in staff cabin
Staff cabin deck
Staff cabin steps
Prepping grease trap
Looking down at drain field and recreation area
Burning brush
Assessing electrical needs
A break from the rain
Even amid the rain, 15 adults and several children worked cheerfully last Saturday.
Work accomplished:
Staff Cabin:
Added 2nd top plate to interior walls
Plumbed up interior walls and door openings
Installed drywall backing for walls and ceiling
Constructed new entry stairs and railings
Removed door plates
Installed H2.5s on trusses
Added missing 2x8 ceiling joist
Girls Bathroom:
Replaced some exterior siding as needed with 3/8" OSB
Installed H2.5s on trusses
Boys Bathroom:
Moved dirt/concrete debris to outside
Framed all interior walls
Installed H2.5s on trusses
Excavation:
Dug new electrical underground ditches from Lower cabins to Boys Bath
Determined where power supply will run from Bathrooms to Cabins